Drill Rig at Toorak Road Level Crossing Removal Project

Drilling 750mm and 1050mm foundation piles on the Toorak Road Level Crossing Removal Project this week. Our piling rig was drilling under 5.5m high structure. This drilling rig design is a one of a kind system which maximises productivity on and off track. This rig is great for those confined or hard to reach jobs.

Read More

New Hi-Rail Piling Rig

In response to customer requirements and to serve the specialist piling operations, we have designed and commissioned a purpose built hi-rail piling rig. The drill rig is mounted on a 25 ton zero swing excavator base. This allows access and working range in the tightest of sites and also allows free movement of other rail…

Read More