Posts Tagged ‘Bore Piles’
CRAWLER PILING RIG
New Crawler Drill Rig For the more challenging or deeper piles, Jordan Rail’s new crawler drill rig has an impressive 90 KN-m of rotary torque, a maximum hole depth of 24m and is equipped with a fully integrated extendable kelly bar system. The drill rig is mounted on a 29t Komatsu excavator for extra power, stability,…
Read MoreNew Volvo ECR355E Zero Slew 35T Excavator
This is one of the most versatile 35t excavators for rail and civil industries. This excavator is especially setup up for bore, sheet & pipe piling, installing structures and can be utilised in wide variety of rail and civil applications. The Volvo excavator comes with a Steelwrist Tiltrotator hitch has the following…
Read MoreDrill Rig at Toorak Road Level Crossing Removal Project
Drilling 750mm and 1050mm foundation piles on the Toorak Road Level Crossing Removal Project this week. Our piling rig was drilling under 5.5m high structure. This drilling rig design is a one of a kind system which maximises productivity on and off track. This rig is great for those confined or hard to reach jobs.
Read MoreMount Victoria Area Remodelling Project
Some shots of piling works on the Mount Victoria Area Remodelling Project. Completing overhead structure foundations during a recent occupation. Another great project with John Holland in New South Wales.
Read More